top of page

Wind Farm

Location:

Lilbourne

Services:

Feasibility Walk Over

Summary:

BK Consultants Ltd were appointed to carry out a Feasibility Walk Over survey to look at upgrading the access road and associated drainage. The current access consisting of compacted hardcore was heavily rutted with potholes due to heavy plant machinery using the access road. The existing access road was causing ponding and localised flooding to the crops grown adjacent to the access road, which had no dedicated drainage system. Existing drainage ditches and watercourses were identified as being suitable with some remediation for diverting storm water into. 

bottom of page